PUMPING STATIONS.
• Diesel-generator powered Electric pumps
•
Electric pumps connected to a national
grid
•
Solar powered pumps
WATER TREATMENT
• Aeration, flocculation and settling
•
Sand filters
•
Chlorination metering pumps
•
Ultra-violet sterilisation
•
Neutralisation, demineralisation
•
Iron removal.
WATER STORAGE
• Water towers of various
designs
- In concrete.
- In galvanised steel, assembled
with sealed joints.
- In galvanised steel with butyl
rubber inner tank.
- In stainless steel.
- In fibber-glass reinforced
polyester resin.
DISTRIBUTION
• PVC piping networks (all diameters).
•
Cast iron piping networks.
•
Collective supply connection
(stand-pipes).
•
Cattle troughs
•
Individual supply connection.
•
Water management.
ELECTRIFICATION
• Decentralised:
by photo-voltaic (solar) electrification,
(individual or collective)
• Centralised:
solar or diesel

Aluminium Water Tower, Gambia
The SEEE/IDIS Group participates
in the “struggle for water”.
With its vocation of participating in the development
of West Africa, SEEE/IDIS could not stand aside from
an area that, for many countries in the region is an absolute
priority: WATER.

10HVA Project — DHM/BADEA — IVORY
COAST (AHEREMOU 2, 2003)
In these areas the SEEE Group has decisively proved its
competence in the following areas:
•
Village and pastoral water supply:
- Complete installations from the supply of drilling equipment
to the training of independent maintenance/repairmen and
of the end users themselves.
•
Town water supply:
- Pumping stations, water towers, water supply piping networks, WATER treatment
plants.
•
Irrigation:
- Market gardens, field irrigation
•
Solar Pumping:
- Installation and maintenance of 300 photovoltaic pumping stations in five countries
of the Sahel (Senegal, Mauritania, Gambia, Cape Verde, Guinea Bissau).

Village Water Supplu Project — Japan XII — Togo
(Agomé, 2000).
Top Of
The Page
|
The SEEE
Group, offers different integrated solutions for water
and power problems in a rural environment, including
the following aspects:
- The analysis of needs with the village communities
- Engineering the systems
- Organising jointly with the local bodies concerned
- Carrying out the installation with operators who
will be subsequently responsible for the maintenance
and management
of the systems.
|

Entente III Council Project —
DTN/AFD —Niger (Hamdallaye 2001)
ACVIP — 7th FED — GUINEA
CONAKRY (Bantignel 1999)
|